Friday, June 26, 2026

GMRS Repeater

June 24, 2026 - Got the RX hooked up and tested repeating - programmed chosen frequency 462.700/467.700 with PL 141.3 on TX/RX.  Ordered a 8 cavity flat pacl mobile duplexer.



 June 20, 2026 - Got the TX hooked up - will do RX next, but need to decide on a frequency.  Using Motorola CDM-1250 radios.













Saturday, June 20, 2026

RCA WV-98A Senior Voltohmyst

 June 20, 2026 - Picked this up a week or two back - the batter was corroded and it didn't have any probes - got a C cell battery holder and hooked that up - the Ohms setting the the DC voltage setting is working.  Need to mount the C battery holder and may need to go ahead and replace some capacitors, but at this moment it looks like it's working fine.






Sunday, June 7, 2026

KD4APP Lab


June 5, 2025 - adding on and moving some things around in the lab - I added the small workbench some time back and the newest workbench is being built (left) - will be moving the Collins R-392 to the lower portion of the new workbench.


April 7, 2023 - Testing the power meter and sensor with my 3400 SGLABS Transverter.


April 3, 2023 - Returned the 80425C sensor because it was faulty and purchased a 80330A sensor 0.01-18GHz/2W which arrived today and works great.



March 22, 2023 - New lab gear purchased. Gigatronics 8041C power meter, 20954-001 cable and  80425C 0.01-18GHz/50W sensor.









December 16, 2021 - More work on the lab getting new equipment in place.





December 15, 2021 - The HP8350 Sweep Oscillator frame with 83592A .01-20.0GHz plugin arrived (top) - testing it with my new EIP548A counter and adjusting as the Sweep Oscillator warms up.



December 9, 2021 - Arrived yesterday - EIP548A 10Hz to 26.5GHz counter with Option 8 - works great - my current signal source only goes to 20GHz and it read it fine.



Just purchased December 4, 2021 - HP8350 Sweep Oscillator frame with 83592A .01-20.0GHz plugin.  And coming soon a listing of all lab assets.




Lab as of October 30, 2021




New addition to the Lab - October 6, 2021



Lab update - New lighting added - June 6, 2021





Lab is almost finished - April 11, 2021
















Lab as of April 1, 2021


 

Lab as of March 31, 2021
















Lab workbench progress as of March 29, 2021